Live Discussion: Staying afloat! Ensuring resiliency for Fort Bragg with floating PV installations.
Fort Bragg and Duke Energy have teamed up to provide improved energy and operational performance for multiple buildings on base, as well as reduce the impact of operational failure from outages. As part of the new partnership, Duke Energy is installing a 1.1MW floating PV on a lake, with a nearby 2MW battery energy storage system, all feeding back onto the base. Join us at 1 pm EST on November 17 to meet the team behind this project and gain insights into the necessity and development of the floating PV installation in the Southeast United States.